Google - Thornton
Grant Street · Thorton, Adams County, CO
Source: OpenStreetMap
Google - Thornton is a mapped data center in Adams County, CO, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 86,059 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkGoogle - Thornton is a mapped data center in Thorton, Adams County, Colorado, run by Google LLC and owned through its parent, Alphabet Inc. Records list a footprint of 86,059 square feet. The site draws power from Public Service Co of Colorado inside the PSCO balancing authority.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle - Thornton
In the news
source: GDELTTax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Water use
No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Denver-Boulder), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Pathways Future Center in Thornton, is 686 ft from this site (390 students). 4 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.