U.S. data-center footprint

Colorado

DataCentersExposed tracks 15 AI data centers in Colorado — 5 operating and 1 in the pipeline — across 7 counties, drawing 578 MW of reported power demand from 4 tracked corporate operators.

Sources: Methodology, Coverage scorecard

DataCentersExposed tracks 15 data centers in Colorado — 5 operating and 1 proposed. The 7 Colorado facilities with disclosed electrical capacity account for 578 MW of demand on the grid — power that competes with homes and businesses for the same generation and transmission.

Reporting by · Updated May 29, 2026

Tracked
15
data centers
Operating
5
live today
Pipeline
1
proposed / building
Demand
578 MW
7 w/ capacity
Counties
7
touched
Operators
4
corporate parents
The story so far

Colorado at a glance

The largest footprint in Colorado belongs to Flexential Corp., behind 4 tracked facilities. Aligned Energy Holdings, LP, Alphabet Inc., and QTS Realty Trust, LLC round out the most active operators in the state. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Weld County leads Colorado with 1 facility and a composite risk score of 20/100. Arapahoe County and El Paso County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Colorado is not done growing. 1 facility is in the pipeline — proposed, permitted, or under construction — which is where residents still have a say at zoning hearings and in rate cases. Each pending project is a decision about land, water, electricity prices, and tax revenue that hasn't been finalized.

We also surface the accountability trail: 2 state bills mentioning data centers and 6 recent news items are tracked for Colorado below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Who's building

Top operators in Colorado

Where it's concentrated

County risk leaderboard

Risk methodology
Still contested

Pipeline & proposals

15 of 15 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Aligned Weld County Campus (proposed)Aligned Energy Holdings, LPProposedWeld500
Flexential - Denver - AuroraFlexential Corp.OperatingArapahoe
Flexential - Denver - Centennial Data CenterFlexential Corp.OperatingArapahoe
Flexential Denver - DowntownFlexential Corp.OperatingDenver
Flexential Denver - EnglewoodFlexential Corp.OperatingDouglas
Google - ThorntonAlphabet Inc.Mapped (unverified)Adams
Insurance Exchange BuildingMapped (unverified)Denver
JPMorgan ChaseMapped (unverified)Broomfield
QTSQTS Realty Trust, LLCMapped (unverified)Arapahoe
Sap Cos02Mapped (unverified)El Paso
T5@Colorado SpringsOperatingEl Paso
Time Warner DatacenterMapped (unverified)Arapahoe
Walmart Colorado Data CenterMapped (unverified)El Paso
Xfinity/Comcast Data CenterMapped (unverified)Arapahoe
zColo by ZayoMapped (unverified)Arapahoe

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.