Google NBY-6

Franklin County, OH

Source: OpenStreetMap

Google NBY-6 is a mapped data center in Franklin County, OH, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 287,583 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Alphabet Inc.
Operator
Google LLC
Est. capacity
~55-120 MW
Footprint
287,583 sq ft
Utility
Licking Rural Electric INC
Grid
PJM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Google NBY-6 is a mapped data center in Franklin County, Ohio, operated by Google LLC and ultimately owned by Alphabet Inc. The site covers 287,583 square feet and draws power through Licking Rural Electric INC, operating within the PJM grid. It is recorded as a Google data center.

Operator chain

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $31.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286
    Ellis County, TX · granted 2024 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346
    Ellis County, TX · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2018 · term yr · source
Statewide cost of this incentive

Ohio reported $130.4M in Sales/use tax exemption for qualified property used in an eligible computer data center (R.C. § 122.175) for FY2024 (Ohio Department of Taxation / Office of Budget and Management). Program-wide, not attributable to this site.

source · All Ohio subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
AEP (Ohio / WV / VA) · 2027/28 auction
$333 /MW-day

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$6.7M to $14.6M/yr

An estimated ~55 to 120 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
59
PM2.5
Moderate
44
O3
Good
25
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Columbus), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$234.9K
People of color
23%
Below poverty
4%
Tract population
4,338

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Licking Heights High School in Pataskala, is 2.4 mi from this site (1,389 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.