AWS New Albany Campus 1 is a mapped data center in Licking County, OH, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented 600 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
AWS New Albany Campus 1 is a hyperscale data center in New Albany, Licking County, Ohio, operated by Amazon Data Services, Inc., a subsidiary ultimately owned by Amazon.com, Inc. Operational since 2019, the site carries a reported power capacity of 600 MW, drawing electricity from AEP Ohio within the PJM grid.
Operator chain
- Ultimate parentAmazon.com, Inc.
- Files asAmazon Data Services, Inc.
- This facilityAWS New Albany Campus 1
In the news
source: Google News- Ohio's data center boom really started in New Albany. We went there to see what it looks like.News 5 Cleveland WEWS· May 11, 2026
- IT company ceases operations at Meta data center campus in New AlbanyThe Business Journals· May 7, 2026
- Sunbury council puts moratorium on data center development until 2027The Columbus Dispatch· Apr 15, 2026
- Sunbury to consider moratorium on data centers after resident pushbackThe Columbus Dispatch· Mar 30, 2026
- Why Sunbury residents are fighting Amazon's proposed data centerThe Columbus Dispatch· Mar 24, 2026
- Hollow Promises in Ohio’s Silicon HeartlandThe American Prospect· Mar 5, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Amazon.com, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Long-Term Rural Enterprise Zone (Morrow County School District 1)$16,668,806Morrow County School District 1, OR · granted 2024 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2024 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
Ohio reported $130.4M in Sales/use tax exemption for qualified property used in an eligible computer data center (R.C. § 122.175) for FY2024 (Ohio Department of Taxation / Office of Budget and Management). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 600 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
600 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Columbus), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, New Albany Primary School in New Albany, is 0.4 mi from this site (1,060 students). 5 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.