Google Council Bluffs
Polk County, IA
Source: Primary source
Google Council Bluffs is an operating data center in Polk County, IA, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 480 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkGoogle Council Bluffs is a hyperscale data center in Polk County, Iowa, operated by Google LLC and ultimately owned by Alphabet Inc. Running since 2009, the site carries a reported power capacity of 480 MW, drawing electricity from Midamerican Energy Co within the MISO grid.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle Council Bluffs
The grid behind this site, right now
source: MISO · gridstatus- Coal20.8%
- Wind20.7%
- Natural Gas19.9%
- Solar18.2%
- Nuclear14.6%
- Imports4.0%
- Other1.8%
Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 2:45 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: GDELT- Palo town hall on proposed Google data center draws pointed questions - Corridor Business JournalCorridor Business Journal· Mar 26, 2026
- Clinton City Council rejects data center moratorium - WQADWQAD· Jun 10, 2026
- City Council turns down temporary halt on AI data centers in Clinton - KWQCKWQC· Jun 9, 2026
- Palo City Council delays vote on proposed data center ordinance - KWWLKWWL· Jun 8, 2026
- Palo City Council advances data center zoning ordinance despite pushback from residents - Iowa Public RadioIowa Public Radio· Jun 2, 2026
- Palo city council advances Google data center ordinance - KCRGKCRG· Jun 1, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Water use
- Reported consumption2.7M gpd2023 · consumption · reported as “Google Council Bluffs” · source
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Des Moines), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Stowe Elementary School in Des Moines, is 0.4 mi from this site (313 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.