EdgeConneX Data Center

Maricopa County, AZ

Source: OpenStreetMap

EdgeConneX Data Center is an operating data center in Maricopa County, AZ, operated by EdgeConneX, Inc..

Reporting by · Updated Jun 14, 2026

Real parent
EdgeConneX, Inc.
Operator
EdgeConneX, Inc.
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

EdgeConneX Data Center is an operating colocation facility in Maricopa County, Arizona, run by EdgeConneX, Inc. Available records do not disclose the company at the top of its ownership chain, its power capacity, or its footprint. Beyond the operator, the site's corporate and environmental record remains thin in public filings.

Operator chain

Data-center discussions in Maricopa County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Phoenix Committee
Jun 14, 2023 · 1 data-center mention
Chandler City Council
Oct 14, 2021 · 1 data-center mention
Chandler City Council
Sep 14, 2020 · 1 data-center mention

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Arizona reported $38.5M in Computer Data Center TPT/Use Tax Exemption (Deduction Code 565; A.R.S. § 41-1519) for FY2025 (Arizona Department of Revenue, Office of Economic Research and Analysis). Program-wide, not attributable to this site.

source · All Arizona subsidies →

Water use

Modeled estimate~106.6K gpd
Direct (onsite cooling)
~63.4K gpd
Indirect (its electricity)
~43.2K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 2.5 L/kWh cooling (arid climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
61
O3
Moderate
61
PM2.5
Moderate
61
PM10
Moderate

Air Quality Index from the nearest AirNow reporting area (Phoenix), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
People of color
Below poverty
Tract population
0

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Pinnacle High School - Tempe in Tempe, is 1,029 ft from this site (25 students). 2 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.