Digital Realty Silicon Valley SJC37
641 Walsh Avenue · Santa Clara, Santa Clara County, CA
Source: OpenStreetMap
Digital Realty Silicon Valley SJC37 is a mapped data center in Santa Clara County, CA, operated by Digital Realty Trust, Inc.. DataCentersExposed has documented a 155,689 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkDigital Realty data center
Operator chain
- Ultimate parentDigital Realty Trust, Inc.
- Files asDigital Realty Trust, Inc.
- This facilityDigital Realty Silicon Valley SJC37
The grid behind this site, right now
source: CAISO · gridstatus- Solar62.2%
- Imports12.0%
- Wind7.6%
- Nuclear6.5%
- Natural Gas4.3%
- Hydro4.0%
- Geothermal2.2%
- Biomass1.2%
Real-time generation mix for the CAISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- Digital Realty Wraps Up $3.3B Data Center FundCommercialSearch· Mar 31, 2026
- Digital Realty Announces Final Close of $3.25 billion U.S. Hyperscale Data Center FundGlobeNewswire· Mar 30, 2026
- Digital Realty Trust Closes $3.25 Billion U.S. Hyperscale Data Center Fund with Global InvestorsMLQ.ai· Mar 30, 2026
- Pensions, sovereign funds back Digital Realty's $3.25B data fundStock Titan· Mar 30, 2026
- Buyside approaches data center-adjacent bonds with cautionBond Buyer· Mar 23, 2026
- Data center developer buys Santa Clara buildings in $100M dealThe Real Deal· Feb 10, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Digital Realty Trust, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2014 · term — yr · source
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Scott Lane Elementary in Santa Clara, is 1.1 mi from this site (396 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.