Overview
source: linkIAD39 is a mapped colocation data center in Ashburn, Loudoun County, Virginia, operated by Digital Realty Trust, Inc. The site covers 549,223 square feet and draws power from Virginia Electric & Power Co within the PJM grid. It sits inside the dense Ashburn cluster, where Digital Realty runs multiple data centers across the region.
Operator chain
- Ultimate parentDigital Realty Trust, Inc.
- Files asDigital Realty Trust, Inc.
- This facilityDigital Realty Northern Virginia IAD39
In the news
source: Google News- PlatformDIGITAL: Global data-center platform for hybrid IT at scaleAD HOC NEWS· Jun 12, 2026
- Virginia Leads U.S. for Data Centers Under ConstructionIndustrial Info Resources· Dec 12, 2025
- An inside look at Digital Realty's new Innovation LabFierce Network· Sep 10, 2025
- More data center investment to be poured into VietnamVnExpress International· Jul 18, 2025
- NTT to launch and list data center REIT in SingaporeData Center Dynamics· May 9, 2025
- Macro-Data Micro-ClimatesSite Selection Magazine· Nov 2, 2024
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Digital Realty Trust, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2014 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 175 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~100 to 220 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Discovery Elementary in Ashburn, is 1.0 mi from this site (710 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline