Digital Realty Ashburn Corporate Campus
Ashburn, Loudoun County, VA
Digital Realty Ashburn Corporate Campus is an operating data center in Loudoun County, VA, operated by Digital Realty Trust, Inc.. DataCentersExposed has documented 380 MW of reported power capacity and 1 tracked EPA enforcement record at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
Digital Realty Ashburn Corporate Campus is an operating colocation data center in Ashburn, Loudoun County, Virginia, run by Digital Realty Trust, Inc. Operational since 2015, the site draws a reported 380 MW from Dominion Energy Virginia within the PJM grid. It carries one tracked environmental enforcement record.
Operator chain
- Ultimate parentDigital Realty Trust, Inc.
- This facilityDigital Realty Ashburn Corporate Campus
In the news
source: Google News- PlatformDIGITAL: Global data-center platform for hybrid IT at scaleAD HOC NEWS· Jun 12, 2026
- Virginia Leads U.S. for Data Centers Under ConstructionIndustrial Info Resources· Dec 12, 2025
- An inside look at Digital Realty's new Innovation LabFierce Network· Sep 10, 2025
- More data center investment to be poured into VietnamVnExpress International· Jul 18, 2025
- NTT to launch and list data center REIT in SingaporeData Center Dynamics· May 9, 2025
- Macro-Data Micro-ClimatesSite Selection Magazine· Nov 2, 2024
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Digital Realty Trust, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2014 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 380 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHO- Clean Air Actno penaltyformal · reported 2023-02-10
Environmental permits
source: Permit register- Clean Air Act permitted sourceVA0000005110700849NAICS 518210; ECHO compliance status: No Violation Identified
- VA DEQ air permit (minor NSR)73370Diesel backup-generator air permit. Program: mNSR. Reg. 73370.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
380 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Cedar Lane Elementary in Ashburn, is 0.3 mi from this site (730 students). 4 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.