Europe · data-center footprint
Austria
DataCentersExposed tracks 12 AI data centers in Austria — 1 operating and 0 in the pipeline — across 5 states, run by 9 tracked operators.
Sources: Methodology, Coverage scorecard
What powers Austria's data centers
Ember · 2025Carbon intensity
117
gCO₂/kWh
Clean electricity
renewables + nuclear
Fossil electricity
17%
coal, gas & oil
Grid demand
77
TWh / year
Demand growth
+0.6%
per year
Data-center power
19.02¢
per kWh · Eurostat
Austria's electricity demand has grown +0.6%/yr (2015–2025). Every new data center competes for that same grid — already 9 MtCO₂ a year from generation.
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center.
Tracked
12
Operating
1
In pipeline
0
Reported power
0 MW
states
5
Operators
9
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
By state
Where the data centers are
Facilities
Tracked data centers
- Conova CommunicationsSalzburgMapped (unverified)
- Digital Realty VIE1 & VIE2Wien · Digital Realty Trust, Inc.Mapped (unverified)
- IT- und Data Center LinzOberösterreichMapped (unverified)
- IT- und Data Center LinzOberösterreich · LINZ NETZ GmbHMapped (unverified)
- IT- und Data Center UrfahrOberösterreich · LINZ STROM GAS WÄRME GmbHMapped (unverified)
- MicrosoftNiederösterreich · Microsoft CorporationMapped (unverified)
- RaitecOberösterreichMapped (unverified)
- Rechenzentrum OstermiethingOberösterreich · Stack Infrastructure, Inc.Mapped (unverified)
- T-Mobile Rechenzentrum GrazSteiermark · T-Mobile / MagentaMapped (unverified)
- Telekom-TowerSteiermark · A1 / Telekom AustriaMapped (unverified)
- Telia Carrier Austria GmbHNiederösterreich · TeliaMapped (unverified)
- earthDATAsafeSteiermark · Kapsch BusinessCom
In the local press
Latest Austria data-center coverage
- Neue Pläne für Maschen: Wohnen, Feuerwehr und Einkaufen statt Mega-Rechenzentrumseevetal-aktuell.de· Jun 16, 2026
- Virtus installiert Großtransformatoren für 300-MW-Campus bei BerlinDataCenter-Insider· Jun 16, 2026
- KI Rechenzentrum Kühlung: Warum steigende Rechenleistung neue Anforderungen an Serverkühlung und Effizienz stelltPresseBox· Jun 16, 2026
- Mehr Tempo im Rechenzentrum – Broadcom Tomahawk 5 zieht die Daten durchAD HOC NEWS· Jun 16, 2026
- (3⁺) ROCKWELL AUTOMATION - Aus der Fabrik hinein ins Rechenzentrumstock3· Jun 16, 2026
- „Markttag" für die Bürger: Vom Investor bis zum Gutachter – Verantwortliche beantworten Fragen zum IG WestfalenSoester Anzeiger· Jun 16, 2026
Live headlines via Google News — in English and Austria's local press.