Austria · state
Niederösterreich
DataCentersExposed tracks 2 AI data centers in Niederösterreich, Austria — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 2 tracked operators.
Sources: Austria, Methodology
Tracked
2
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- MicrosoftMicrosoft CorporationMapped (unverified)
- Mapped (unverified)
In the local press
Niederösterreich data-center coverage
- Datacenter soll wirtschaftlich stärken: Rechenzentrum ebnet Weg für InfrastrukturMeinBezirk.at· Jun 8, 2026
- Holz-Rechenzentrum überzeugt Landeshauptfraui-Magazin· Apr 22, 2026
- Erschwert den Ausbau - Server-Farmen: Kritik an geplanter RegulierungKronen Zeitung· Apr 19, 2026
- Zeichen der digitalen Zukunft – NÖ legt als erstes Land Regeln für Rechenzentren vorHeute· Apr 17, 2026
- Strategie entwickelt - Wie „Big Data“ künftig das weite Land erobern sollKronen Zeitung· Apr 17, 2026
- Niederösterreich präsentiert Rechenzentren-StrategieLand Niederösterreich· Apr 16, 2026
Live headlines via Google News — in English and Austria's local press.