Mapped (unverified)
Raitec
Oberösterreich, Austria
Source: OpenStreetMap
Raitec is a mapped data center in Oberösterreich, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Oberösterreich
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Niedrigere Zinsen, mehr Risiko: Weniger Gewinn für Raiffeisen in KärntenKleine Zeitung· Apr 29, 2026
- IT-Manager wechselt: Alexander Wiesinger unterstützt Raitec - LinzMeinBezirk.at· Mar 3, 2026
- Die kleine VKB und ihr größeres Raiffeisen-ProblemOberösterreichische Nachrichten· Dec 20, 2025
- RAITEC: Kärntner Raiffeisen-IT wird integriertRaiffeisenzeitung· Jul 30, 2025
- RAITEC-Integration: Georg Messner im InterviewRaiffeisenzeitung· Jul 30, 2025
- Zwei bleiben über: Raiffeisen-IT konsolidiert | Unternehmen | 29.07.2025FONDS professionell· Jul 29, 2025