Yondr - Rechenzentrum
Bischofsheim, Hessen, Germany
Source: OpenStreetMap
Yondr - Rechenzentrum is a mapped data center in Hessen, Germany, operated by Yondr. DataCentersExposed has documented 40 MW of reported power capacity and a 188,016 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkYondr operates this mapped data center in Bischofsheim, in Germany's Hesse region. The site carries a reported power capacity of 40 MW across a footprint of 188,016 square feet, described in existing records simply as a 40MW Data Center. Public details on the project's ultimate corporate ownership are not confirmed in the verified record.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Yondr nimmt 20-Megawatt-Rechenzentrum bei Frankfurt in BetriebDataCenter-Insider· Jul 15, 2025
- Arbeiten am Bischofsheimer Rechenzentrum schreiten voranEcho Online· Sep 11, 2024
- Großes Potenzial und offene Fragen beim neuen RechenzentrumEcho Online· Jun 18, 2024
- In Bischofsheim soll Anfang 2023 ein Rechenzentrum entstehenEcho Online· Dec 21, 2022
- Wann startet der Bau des Bischofsheimer Rechenzentrums?Echo Online· Nov 8, 2022
- Eine Gewerbefläche, drei Angebotefnp.de· Dec 9, 2020