Skip to content
DataCentersExposed
Mapped (unverified)

Artec data center, Hessen, Germany

Hessen, Germany

Source: OpenStreetMap

Artec data center in Hessen, Germany is a mapped facility, operated by Artec. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Artec
Operator
Artec
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Hessen
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Artec is a mapped data center in Germany operated by Artec. Available records describe it only as an Artec data center, with no parent company disclosed. Its capacity, footprint, and operational status remain unspecified in the facts on hand.

Operator chain

  • Ultimate parent
    Artec
  • Files as
    Artec
  • This facility
    Artec data center

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh

A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Germany data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.