Google Union County (proposed)

Union County, OH

Google Union County (proposed) is a proposed data center in Union County, OH, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 600 MW of reported power capacity at this site.

Reporting by · Updated Jun 14, 2026

Campaign · Decision pending

Take action

Union, Ohio

0
supporters

A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Power & your bill

600 MW of new demand — roughly a city of 480,000 homes.

Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in OH is 18.8¢/kWh, up 16.6% year-over-year. (MW→homes is a rough ~800/MW planning figure.)

Source
Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Alphabet Inc.
Operator
Google LLC
Power
600 MW
Utility
Union Rural Electric Coop, INC
Grid
PJM
Attribution & capacity confidence:mediumprovenance JSON
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

Google Union County is a proposed hyperscale data center in Union County, Ohio, operated by Google LLC, a subsidiary of Alphabet Inc. Proposed in 2025, the project carries a reported power capacity of 600 MW, drawing from Union Rural Electric Coop, INC within the PJM grid. The site remains in the proposal stage and has not been built.

Operator chain

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $31.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286
    Ellis County, TX · granted 2024 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346
    Ellis County, TX · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2018 · term yr · source
Statewide cost of this incentive

Ohio reported $130.4M in Sales/use tax exemption for qualified property used in an eligible computer data center (R.C. § 122.175) for FY2024 (Ohio Department of Taxation / Office of Budget and Management). Program-wide, not attributable to this site.

source · All Ohio subsidies →

Water use

Modeled estimate~11.2M gpd
Direct (onsite cooling)
~5.5M gpd
Indirect (its electricity)
~5.8M gpd

No measured record exists, so this is a low-confidence model from 600 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
AEP (Ohio / WV / VA) · 2027/28 auction
$333 /MW-day

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site cleared at the PJM-wide (RTO) price, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost
$72.9M/yr

600 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
59
PM2.5
Moderate
44
O3
Good
25
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Columbus), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$96.3K
People of color
7%
Below poverty
3%
Tract population
2,558

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Navin Elementary School in Marysville, is 2.7 mi from this site (407 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.