Skip to content
DataCentersExposed
Mapped (unverified)

Teraco JB5 Data Centre

Gauteng, South Africa

Source: OpenStreetMap

Teraco JB5 Data Centre is a mapped data center in Gauteng, South Africa, operated by Teraco and ultimately owned by Digital Realty Trust, Inc.. DataCentersExposed has documented a 108,396 sq ft footprint at this site. It runs on South Africa's grid, which was 82% fossil-fuelled at 699 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Digital Realty Trust, Inc.
Operator
Teraco
Est. capacity
~20-45 MW
Footprint
108,396 sq ft
Grid carbon
699 gCO₂/kWh
Clean electricity
18%
Region
Gauteng
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Teraco JB5 is a mapped data center in South Africa, operated by Teraco and held through its ultimate parent, Digital Realty Trust, Inc. The site has a reported footprint of 108,396 square feet. Beyond the Teraco operating record, further detail on the location is not disclosed in available records.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
699 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%

National grid context, not this facility's own metering. Full country picture: South Africa data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.