Telehouse Teleport
7 Teleport Drive · New York City, Richmond County, NY
Source: OpenStreetMap
Telehouse Teleport is an operating data center in Richmond County, NY. DataCentersExposed has documented a 69,999 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkTelehouse Teleport is an operating data center in New York City's Richmond County, New York, run under the Telehouse name. Its reported footprint is 69,999 square feet. The site draws power from Consolidated Edison Co-Ny Inc within the NYIS balancing authority. Ownership above the Telehouse operation is not detailed in available records.
The grid behind this site, right now
source: NYISO · gridstatus- Natural Gas43.0%
- Nuclear26.7%
- Hydro21.6%
- Other5.9%
- Wind2.7%
Real-time generation mix for the NYISO grid this site draws from, as of Jun 16, 2026, 4:25 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- NY data center moratorium waits for Hochul's signaturemorning-times.com· Jun 16, 2026
- Avista puts data center service talks on pauseDaily Energy Insider· Jun 16, 2026
- Onondaga County creating a task force to study impact of data centersWSYR· Jun 16, 2026
- Clay could vote soon on 1-year data center banSyracuse.com· Jun 16, 2026
- What are 'best practices' for building a data center in Onondaga County? McMahon to fund $500K study to find outCentral Current· Jun 15, 2026
- New Mexico is in a historic drought. Oracle and OpenAI designed their newest data center with that in mindFortune· Jun 15, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.2 L/kWh cooling (cool climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northeast Urban), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, New Ventures Charter School in Staten Island, is 0.3 mi from this site (155 students). 4 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.