Mapped (unverified)
Tdf
Hauts-de-France, France
Source: OpenStreetMap
Tdf is a mapped data center in Hauts-de-France, France. DataCentersExposed has documented a 24,009 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
24,009 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Hauts-de-France
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Pas loin de leurs clients et sur-mesure : TDF veut miser sur son implantation territoriale forte pour proposer des data centers de proximitéNice-Matin· May 28, 2026
- Pour « casser le mythe » autour des data centerswww.lamarseillaise.fr· May 28, 2026
- TDF étend son data center de la région marseillaiseL'Informaticien· May 27, 2026
- Le Club lyonnais de l'immobilier et de la construction passe les data centers au révélateurmesinfos· May 26, 2026
- Numérique européen : l’Allemagne prend son indépendance vis-à-vis de la tech américaineOuest-France· Mar 25, 2026
- Intelligence artificielle : Comment l’État veut favoriser l’implantation de data centers en France ?L'Usine Digitale· Nov 28, 2025