Ate data center, Hauts-de-France, France
Hauts-de-France, France
Source: OpenStreetMap
Ate data center in Hauts-de-France, France is a mapped facility, operated by Ate. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkAte is a mapped data center in France, operated by Ate. Available records do not identify an ultimate corporate parent, and no capacity, footprint, or environmental enforcement figures are disclosed for the site. Its status remains limited to a basic listing pending further documentation.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Data center de Google près de Châteauroux : le calendrier du projet se préciseici.fr· Jun 16, 2026
- APL Data Center ouvre de nouveaux bureaux à MarseilleLa Provence· Jun 15, 2026
- Un data center de 200 millions d’euros à Saint-Priest : la consultation publique a démarré, des interrogations émergentLe Progrès· Jun 13, 2026
- « Si le méga data center de Gauriaguet est dédié à un Gafam, c'est un drame »Placéco· Jun 12, 2026
- Référé suspension contre le Data Center à Rovaltain – Communiqué de presseLes Amis de la Terre France· Jun 12, 2026
- La question du jour. Seriez-vous prêt à accueillir un data center près de chez vous ?Ouest-France· Jun 12, 2026