RagingWire CA3 is an operating data center in Sacramento County, CA, operated by RagingWire Data Centers and ultimately owned by NTT Global Data Centers. DataCentersExposed has documented a 151,366 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
NTT Global Data Centers
Operator
RagingWire Data Centers
Est. capacity
~30-65 MW
Footprint
151,366 sq ft
Utility
Sacramento Municipal Util Dist
Grid
BANC
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

RagingWire CA3 is an operating colocation data center in Sacramento, Sacramento County, California, run by RagingWire Data Centers and owned through its ultimate parent, NTT Global Data Centers. The site covers a reported 151,366 square feet. It draws power from the Sacramento Municipal Utility District inside the BANC balancing authority.

Operator chain

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to NTT Global Data Centers (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • The Climate Change Agreement$0
    HMRC, United Kingdom · granted 2024 · term yr · source
  • The Climate Change Agreement$0
    HMRC, United Kingdom · granted 2023 · term yr · source
  • The Climate Change Agreement$0
    HMRC, United Kingdom · granted 2022 · term yr · source
  • The Climate Change Agreement$0
    HMRC, United Kingdom · granted 2021 · term yr · source

Water use

Modeled estimate~93.9K gpd
Direct (onsite cooling)
~50.7K gpd
Indirect (its electricity)
~43.2K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Who lives nearby

source: Census ACS 2023
Median household income
$112.8K
People of color
90%
Below poverty
36%
Tract population
3,224

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Sava - Sacramento Academic And Vocational Academy in Sacramento, is 0.5 mi from this site (176 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.