RagingWire CA2
1312 Striker Avenue · Sacramento, Sacramento County, CA
Source: OpenStreetMap
RagingWire CA2 is an operating data center in Sacramento County, CA, operated by RagingWire Data Centers and ultimately owned by NTT Global Data Centers. DataCentersExposed has documented a 204,702 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkRagingWire CA2 is an operating colocation data center in Sacramento, Sacramento County, California, run by RagingWire Data Centers and owned through its parent, NTT Global Data Centers. Its reported footprint is 204,702 square feet. The site draws power from Sacramento Municipal Utility District inside the BANC balancing authority.
Operator chain
- Ultimate parentNTT Global Data Centers
- Files asRagingWire Data Centers
- This facilityRagingWire CA2
In the news
source: Google News- Prime, NTT Data Centers expanding in Sacramento by many megawattsThe Business Journals· Mar 12, 2026
- Cities With The Most Data Centers24/7 Wall St.· Apr 29, 2025
- RagingWire to Build Third Massive Data Center on Sacramento CampusData Center Knowledge· May 31, 2024
- NTT Communications Acquires Controlling Interest in RagingWireData Center Knowledge· May 31, 2024
- Raging Wire Expands in Northern VirginiaData Center Knowledge· May 31, 2024
- Prime Data Centers opens first facility at McClellan ParkThe Business Journals· Jan 14, 2020
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to NTT Global Data Centers (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2024 · term — yr · source
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2023 · term — yr · source
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2022 · term — yr · source
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2021 · term — yr · source
Water use
No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Sava - Sacramento Academic And Vocational Academy in Sacramento, is 0.3 mi from this site (176 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.