Mapped (unverified)colocation
Previder PDC1
Hengelo, Overijssel, Netherlands
Source: Primary source
Previder PDC1 is a mapped data center in Overijssel, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Overijssel
Overview
source: linkPrevider B.V. — colocation facility (10 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Zeer grote brand bij datacenter in AlmereHart van Nederland· May 7, 2026
- Thales en KPN bouwen staatsgeheime militaire cloud voor DefensieRTV Oost· Apr 12, 2026
- Twentse tech slaat terug: zeven bedrijven bouwen aan alternatief voor Amerikaanse cloudreuzenTubantia· Apr 3, 2026
- Hengelo's bedrijf Previder maakt vuist tegen Amerikaanse techreuzen1Twente· Apr 3, 2026
- Space datacenters voorlopig nog sciencefictionComputable.nl· Mar 25, 2026
- AI-toekomst in gevaar: Europa raakt ver achterop in datacenterwedloopsDe Telegraaf· Nov 25, 2025
See something wrong or missing on this page? Suggest a correction.