Mapped (unverified)colocation
ITB2 Datacenter Deventer
Deventer, Overijssel, Netherlands
Source: Primary source
ITB2 Datacenter Deventer is a mapped data center in Overijssel, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Overijssel
Overview
source: linkITB-Kwadraat B.V. — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Plus: Dit was de impact van de dc-sluiting in Deventer en zo gaat de vrieslogistiek eruitzienLogistiek· Apr 17, 2026
- TakeAware koopt grootschalig DC in GroningenPropertyNL· Jan 7, 2026
- Miljardenbedrijf vestigt in voormalig Plus-dc in DeventerVastgoedmarkt· Nov 28, 2025
- Plus doet distributiecentrum in Deventer over aan Royal A-wareDistrifood· Nov 28, 2025
- Moederbedrijf AB Texel betrekt voormalig vers-dc van Plus in DeventerNieuwsblad Transport· Nov 27, 2025
- Royal A-ware neemt distributiecentrum Plus overLevensmiddelenkrant· Nov 27, 2025
See something wrong or missing on this page? Suggest a correction.