Mapped (unverified)colocation
NTT Sonezaki Data Center(Dojima Campus)
Osaka-Shi Kita-Ku, Osaka, Japan
Source: Primary source
NTT Sonezaki Data Center(Dojima Campus) is a mapped data center in Osaka, Japan. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Osaka
Overview
source: linkNTT SmartConnect Corporation — colocation facility (19 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- Colt opens new data center in Osaka, and planning new Mumbai campusData Center Dynamics· Mar 13, 2023
- OPTAGE Builds Its Fifth Data Center in Osaka, JapanBusiness Wire· Jan 24, 2023
- We tried all three kinds such as moist and creamy ice cream "Concrete" limited item "Strawberry Sunset" at NY's popular shops at Shake ShackGIGAZINE· Jun 8, 2018
See something wrong or missing on this page? Suggest a correction.