Skip to content
DataCentersExposed
Mapped (unverified)

NEXTDC Darwin D1

Northern Territory, Australia

Source: OpenStreetMap

NEXTDC Darwin D1 is a mapped data center in Northern Territory, Australia, operated by NEXTDC. DataCentersExposed has documented a 9,366 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
NEXTDC
Operator
NEXTDC
Footprint
9,366 sq ft
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Northern Territory
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

NEXTDC Darwin D1 is a mapped data center in Australia, operated by NEXTDC. Available records list a footprint of 9,366 square feet. No ultimate parent above NEXTDC is identified in the facts on hand, and no operational details beyond its mapped status are documented.

Operator chain

  • Ultimate parent
    NEXTDC
  • Files as
    NEXTDC
  • This facility
    NEXTDC Darwin D1

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%

National grid context, not this facility's own metering. Full country picture: Australia data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.