Australia · state
Northern Territory
DataCentersExposed tracks 1 AI data center in Northern Territory, Australia — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 1 tracked operator.
Sources: Australia, Methodology
Tracked
1
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- NEXTDC Darwin D1NEXTDCMapped (unverified)
In the local press
Northern Territory data-center coverage
- Data centres could unblock renewables bottlenecks – if they don’t hit barriers of their ownRenew Economy· Jun 16, 2026
- Anthropic in talks to save Cannon-Brookes’ SunCable dreamThe Australian· Jun 12, 2026
- North America data centre group unveils 800MW facility in South AustraliaGreen Street News· Jun 4, 2026
- The abandoned Aussie town set for a $10 billion paydayDomain· Jun 4, 2026
- Australia’s economy sinks to eight-year low after trade shockSky News Australia· Jun 2, 2026
- The data centre mega-hub being quietly mapped out in Melbourne’s westSMH.com.au· May 29, 2026
Live headlines via Google News — in English and Australia's local press.