Skip to content
DataCentersExposed
Mapped (unverified)colocation

Mobily JED1 DC

Jeddah, Makkah, Saudi Arabia

Source: Primary source

Mobily JED1 DC is a mapped data center in Makkah, Saudi Arabia. It runs on Saudi Arabia's grid, which was 98% fossil-fuelled at 692 gCO₂e/kWh in 2024 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Operator
Grid carbon
692 gCO₂/kWh
Clean electricity
2%
Region
Makkah
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Etihad Etisalat (Mobily) — colocation facility (4 networks present). Source: PeeringDB.

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
692 gCO₂/kWh
Clean electricity
2%
Fossil electricity
98%

National grid context, not this facility's own metering. Full country picture: Saudi Arabia data centers.

No recent coverage found for this facility.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.