Mapped (unverified)colocation
Mobily JED1 DC
Jeddah, Makkah, Saudi Arabia
Source: Primary source
Mobily JED1 DC is a mapped data center in Makkah, Saudi Arabia. It runs on Saudi Arabia's grid, which was 98% fossil-fuelled at 692 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
692 gCO₂/kWh
Clean electricity
2%
Region
Makkah
Overview
source: linkEtihad Etisalat (Mobily) — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
692 gCO₂/kWh
Clean electricity
2%
Fossil electricity
98%
National grid context, not this facility's own metering. Full country picture: Saudi Arabia data centers.
In the news
source: Google News (local + English)No recent coverage found for this facility.
See something wrong or missing on this page? Suggest a correction.