Skip to content
DataCentersExposed
Mapped (unverified)

Neom Hyper Scale Data Center

Tabuk, Saudi Arabia

Source: OpenStreetMap

Neom Hyper Scale Data Center is a mapped data center in Tabuk, Saudi Arabia. DataCentersExposed has documented a 606,677 sq ft footprint at this site. It runs on Saudi Arabia's grid, which was 98% fossil-fuelled at 692 gCO₂e/kWh in 2024 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~120-250 MW
Footprint
606,677 sq ft
Grid carbon
692 gCO₂/kWh
Clean electricity
2%
Region
Tabuk
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.