Microsoft Boydton Data Center is a mapped data center in Mecklenburg County, VA, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation.
Reporting by Eric Keller · Updated Jun 16, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkMicrosoft Boydton is a mapped data center in Mecklenburg County, Virginia, run by Microsoft Data Center LLC and owned through its parent, Microsoft Corporation. The site draws power from Mecklenburg Electric Cooperative inside the PJM grid.
Operator chain
- Ultimate parentMicrosoft Corporation
- Files asMicrosoft Data Center LLC
- This facilityMicrosoft Boydton Data Center
In the news
source: GDELTTax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2023 · term — yr · source
- Qualified Data Center Sales Tax Exemption$0State of Wisconsin · granted 2023 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2021 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2015 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2013 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2013 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Mecklenburg County Middle in Baskerville, is 4.6 mi from this site (874 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).