Mapped (unverified)colocation
ITENOS Stuttgart (STR1)
Stuttgart, Baden-Württemberg, Germany
Source: Primary source
ITENOS Stuttgart (STR1) is a mapped data center in Baden-Württemberg, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Overview
source: linkITENOS GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- BACHMANN strengthens cybersecurity and compliance in the data center environment – NIS2 as a strategic driverMynewsdesk· Jun 16, 2026
- "It's Very Iconic!" The Witcher's Henry Cavill On *that* Bath Scene, Geralt's Voice And Meeting Fans Data Center (MXgBJ6BRWc)Fathom Journal· Jun 12, 2026
- Exyte secures three major AI-driven data center projects near Frankfurt - supporting 400 jobs in GermanyMorningstar· Jun 11, 2026
- Little Rock board passes data center rules after nearly 2 hours of public commentKATV· Jun 3, 2026
- AtlasEdge secures EUR 1.2 bln to support European data centre expansionTelecompaper· May 29, 2026
- Rechenzentrum Universität Greifswald HWP PlanungWorld-Architects· May 28, 2026
See something wrong or missing on this page? Suggest a correction.