Mapped (unverified)colocation
Ibercom Madrid
Madrid, Comunidad de Madrid, Spain
Source: Primary source
Ibercom Madrid is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkIbercom — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Madrid se posiciona como una de las localizaciones más atractivas para la construcción de centros de datosenergynews.es· Jun 17, 2026
- El Gobierno invierte 719 millones en un centro avanzado de IA: cómo es el proyecto y qué empresas participanInfobae· Jun 17, 2026
- Madrid alberga un tesoro espacial oculto: una biblioteca del Universo de 1,4 petabytes creada por la ESA20Minutos· Jun 17, 2026
- El Gobierno inyecta 719 millones al proyecto español para albergar en España la gigafactoría europea de IAEl Economista· Jun 16, 2026
- Una "gigafactoría de IA" entre Madrid y Tarragona suena muy bien: cuando miras la letra pequeña, no tantoXataka· Jun 16, 2026
- Madrid, entre los principales nuevos mercados de inversión en centros de datos en EMEAIdealista· Jun 16, 2026
See something wrong or missing on this page? Suggest a correction.