Mapped (unverified)colocation
Adam - MAD
Alcalá de Henares, Comunidad de Madrid, Spain
Source: Primary source
Adam - MAD is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkADAM — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Centros de datos en España: el Boom de 66.900 millones de eurosRankia· May 7, 2026
- El triángulo del Henares, una mina de oro de los centros de datos por explotarABC· May 5, 2026
- Vaultica refuerza su presencia en Europa con un nuevo centro de datos en Madridituser.es· Apr 30, 2026
- Vaultica levanta un centro de datos de 12 MW en AlcaláMerca2.es· Apr 29, 2026
- Vaultica implantará un centro de datos en Alcalá de HenaresSilicon· Apr 28, 2026
- Madrid albergará un enorme centro de datos de Microsoft: ubicación y todo lo que se sabeEl Confidencial· Apr 21, 2026
See something wrong or missing on this page? Suggest a correction.