Google Jackson County Data Center
Jackson County, AL
Source: OpenStreetMap
Google Jackson County Data Center is a mapped data center in Jackson County, AL, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 144,996 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkGoogle LLC data center
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle Jackson County Data Center
In the news
source: Google News- Alphabet (GOOGL) Stock: Google's $1.5B Alabama Data Center Expansion Goes All-In on Self-FundingBlockonomi· Jun 16, 2026
- Google plans to invest $1.5 billion to expand its data center in Alabama.富途牛牛· Jun 16, 2026
- Google to spend $1.5 billion on Alabama data center expansion By Investing.comInvesting.com Canada· Jun 16, 2026
- Fort Wayne leader addresses city council member’s Google data center resolutions, highlights misinformationWPTA | 21Alive | Fort Wayne, IN· Jun 16, 2026
- Google plans $1.5 billion Jackson County data center expansionAlabama Political Reporter· Jun 16, 2026
- Google to spend $1.5bn expanding its data center campus in Jackson County, AlabamaData Center Dynamics· Jun 16, 2026
Data-center discussions in Jackson County
source: LocalView (CC0)Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Bridgeport Elementary School in Bridgeport, is 2.4 mi from this site (174 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.