Google Henderson (proposed)
Clark County, NV
Google Henderson (proposed) is a proposed data center in Clark County, NV, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 600 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Take action
Clark, Nevada
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
600 MW of new demand — roughly a city of 480,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in NV is 14.2¢/kWh, down 1.8% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
Google Henderson is a proposed hyperscale data center in Clark County, Nevada, operated by Google LLC and ultimately owned by Alphabet Inc. Proposed in 2025, the project carries a reported power capacity of 600 MW, drawing from Nevada Power Co within the NEVP balancing authority. The site remains unbuilt, and its eventual demands on the regional grid are not yet operating.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle Henderson (proposed)
In the news
source: GDELT- Google signs 150MW geothermal PPA with Ormat in Nevada - Data Center DynamicsData Center Dynamics· Feb 17, 2026
- Developers of proposed data center hold second community meeting as opposition continues - FOX5 VegasFOX5 Vegas· May 5, 2026
- Boulder City residents rally against proposed AI data center - FOX5 VegasFOX5 Vegas· Apr 24, 2026
- Developer of proposed AI data center in Boulder City postpones application for land - FOX5 VegasFOX5 Vegas· Apr 10, 2026
- Boulder City residents push back on proposed AI data center at developer’s first public meeting - FOX5 VegasFOX5 Vegas· Apr 7, 2026
- These Boulder City residents are not happy about proposed data center - Las Vegas Review-JournalLas Vegas Review-Journal· Apr 7, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Nevada reported $80.7M in Data center partial abatement of local sales/use tax (NRS 360.754) — all local components combined for FY2025 (State of Nevada Controller's Office). Program-wide, not attributable to this site.
Water use
- Reported consumption435.1K gpd2023 · consumption · reported as “Google Henderson” · source
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Las Vegas), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Sunrise Mountain Hs in Las Vegas, is 1.1 mi from this site (2,622 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.