Google Data Center The Dalles Oregon
Wasco County, OR
Source: OpenStreetMap
Google Data Center The Dalles Oregon is an operating data center in Wasco County, OR, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 185 MW of reported power capacity and a 1,487,396 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkGoogle Data Center The Dalles is an operating data center in Wasco County, Oregon, run by Google LLC and ultimately owned by Alphabet Inc. Operational since 2025, the site spans 1,487,396 square feet and draws a reported 185 MW of power. It pulls electricity from Northern Wasco County PUD within the BPAT balancing authority.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle Data Center The Dalles Oregon
In the news
source: GDELT- Google cloud? Steam from data centers may be disrupting aviation along Columbia River - OregonLive.comOregonLive.com· Apr 17, 2026
- The Dalles’ mayor called OPB’s data center story inaccurate. Here are the facts - Oregon Public Broadcasting - OPBOregon Public Broadcasting - OPB· Jan 23, 2026
- Alphabet Inc. (Class A) Stock (US02079K3059): Google boosts Alabama data centers with $1.5 billion p - AD HOC NEWSAD HOC NEWS· Jun 15, 2026
- Google hosts another invitation-only meeting about planned Little Rock data center - The Arkansas Democrat-GazetteThe Arkansas Democrat-Gazette· Jun 11, 2026
- Anthropic Turns To Google To Back Massive Data Center Push - BenzingaBenzinga· Jun 11, 2026
- Alphabet's Surprising $80 Billion Data Center Raise and OpenAI's Massive Expansion - HarianBasis.coHarianBasis.co· Jun 5, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2018 · term — yr · source
Oregon reported $26.9M in Enterprise Zone (Long-Term Rural EZ, ORS 285C.400) property-tax abatement — Crook County (Meta Prineville campus) for FY2025 (Crook County, Oregon (audited financial statements / GASB 77 note)). Program-wide, not attributable to this site.
Water use
- Reported consumption828.5K gpd2023 · consumption · reported as “Google The Dalles” · source
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (The Dalles), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Chenowith Elementary School in The Dalles, is 1.1 mi from this site (384 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.