Skip to content
DataCentersExposed
Mapped (unverified)

Fullsave Toulouse

Toulouse, Occitanie, France

Source: OpenStreetMap

Fullsave Toulouse is a mapped data center in Occitanie, France. DataCentersExposed has documented a 37,397 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~5-15 MW
Footprint
37,397 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Occitanie
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.