Albiréo is a mapped data center in Occitanie, France. DataCentersExposed has documented a 62,667 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~10-30 MW
Footprint
62,667 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Occitanie
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkAlbiant IT - Albiréo - Site Topaze
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Castres. Immersion dans le bunker de la banqueladepeche.fr· Nov 2, 2010
- The path to data center decarbonization starts nowData Center Dynamics· Jul 28, 2023
- Reduction of the Group’s carbon footprint: both Albiréo and Antarès awarded certificationGroupe BPCE· Dec 10, 2021
- Beautiful Albireo On Utah SkiesUtah Public Radio· Aug 24, 2020
Environmental permits
source: Géorisques (ICPE)- LES FERMIERS OCCITANS0006809474ICPE Autorisation · Labruguiere 81290 · registered as "LES FERMIERS OCCITANS" · ~290 m from the mapped location