Skip to content
DataCentersExposed
Mapped (unverified)colocation

Florido Tower

Vienna, Wien, Austria

Source: Primary source

Florido Tower is a mapped data center in Wien, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Operator
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Wien
Attribution & capacity confidence:mediumprimary source

Overview

source: link

FLORIDO TOWER GMBH & CO. KG — colocation facility (3 networks present). Source: PeeringDB.

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh

A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Austria data centers.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.