Euclyde DC5 is a mapped data center in Auvergne-Rhône-Alpes, France, operated by Euclyde. DataCentersExposed has documented a 13,450 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEuclyde DC5 is a mapped data center in France, operated by Euclyde. Available records describe it as a Euclyde data center, with a reported footprint of 13,450 square feet. No parent company above Euclyde is disclosed in available records.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Euclyde Datacenters rachète un centre de données en Île-de-FranceTribuca· Oct 12, 2025
- Euclyde Datacenters devient nLighten FranceChannelNews· Nov 26, 2024
- Euclyde Datacenters affiche plus de 30 % de croissance en 2023Distributique· Jan 26, 2024
- Un nouveau datacenter pour Euclyde en AlsaceGoodTechInfo· Jun 30, 2023
- Un nouveau datacenter à Strasbourg pour EuclydeGoodTechInfo· Dec 14, 2022
- Illkirch-Graffenstaden. Le data center d’Euclyde sera mis en service au 4e trimestre 2021DNA· Jun 13, 2021
Environmental permits
source: Géorisques (ICPE)- SPEL0006103899ICPE Enregistrement · Villeurbanne 69100 · registered as "SPEL" · ~52 m from the mapped location