Mapped (unverified)
Adista Saint-Étienne
Saint-Étienne, Auvergne-Rhône-Alpes, France
Source: OpenStreetMap
Adista Saint-Étienne is a mapped data center in Auvergne-Rhône-Alpes, France. DataCentersExposed has documented 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Auvergne-Rhône-Alpes
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Economie. Ils sont indispensables à l'IA : y a-t-il un data center près de chez vous?Le Progrès· Jun 11, 2026
- Les data centers en chiffres clésRTE France· Jun 1, 2026
- Vénissieux : UltraEdge mise sur Lyon pour son réseau de data centersmesinfos· Mar 19, 2026
- Un bâtiment agricole en feu dans le Puy-de-DômeLa Montagne· Mar 17, 2026
- La métropole de Lyon donne le feu vert pour un data center responsable au sein de la ZAC Bron-ParillyLe Journal des Entreprises· Feb 18, 2026
- Les 760 Novasco sont en sursis : un repreneur des quatre usines doit être trouvé avant le 12 novembreL'Humanité· Oct 31, 2025
Environmental permits
source: Géorisques (ICPE)- NOVASCO (ex-ASCOMETAL - LE MARAIS)0006111269ICPE Enregistrement · Saint-Étienne 42000 · registered as "NOVASCO (ex-ASCOMETAL - LE MARAIS)" · ~243 m from the mapped location