Edged Fort Worth Data Center
Fort Worth, Tarrant County, TX
Source: Primary source
Edged Fort Worth Data Center is a proposed data center in Tarrant County, TX.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkCity of Fort Worth will consider whether to grant Edged a ten-year abatement for Business Personal Property taxes at a rate of 50 percent, valued at $18.2 million Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- City plans open house on proposed data center development regulationsThe Business Press· Jun 19, 2026
- Fort Worth mayor’s husband listed as lobbyist for data center groupFort Worth Report· Jun 18, 2026
- Fort Worth pushes vote for $10B data center site plan to Aug. 25. What to knowFort Worth Star-Telegram· Jun 18, 2026
- Proposed 400-acre Fort Erie data centre would consume 87,000 homes worth of powerFort Erie Radio· Jun 18, 2026
- Husband of Fort Worth mayor listed as lobbyist for data center industry groupAOL.com· Jun 18, 2026
- New $876 million AI data center electronics megaproject coming to Fort WorthMSN· Jun 18, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Basis Benbrook in Benbrook, is 1.7 mi from this site (331 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.