Mapped (unverified)colocation
Digital Edge TYO4, TYO5, TYO6 - Tokyo
Yokohama, Kanagawa,, Kanagawa, Japan
Source: Primary source
Digital Edge TYO4, TYO5, TYO6 - Tokyo is a mapped data center in Kanagawa, Japan, operated by EDGE DC. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
EDGE DC
Operator
EDGE DC
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Kanagawa
Overview
source: linkDigital Edge DC — colocation facility (1 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- Quantum Mesh、IIJ、ネットチャート、液浸冷却システム搭載の分散型エッジデータセンターの取扱いを開始PR TIMES· Apr 7, 2026
- 三菱重工×ソフトバンク、横浜のエッジデータセンターでエッジAIアプリケーションの実証マイナビニュース· Mar 2, 2026
- 新たなデータセンター「inet annex」を2026年1月に開所 | 株式会社アイネットのプレスリリースPR TIMES· Jan 21, 2026
- 4月22日(月) 「Earth Day アースデイ」ESRの21施設でロゴ・外壁照明を一晩消灯しますPR TIMES· Apr 17, 2024
- NEC がデータセンターの売却を検討かData Center Cafe· Mar 14, 2024
- デジタルエッジ、日本橋小舟町で新データセンター開設。2025年初頭クラウド Watch· Apr 25, 2023