Mapped (unverified)colocation
Datencenter 3 - Innsbruck
Innsbruck, Tirol, Austria
Source: Primary source
Datencenter 3 - Innsbruck is a mapped data center in Tirol, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Tirol
Overview
source: linkHALLAG Kommunal GmbH — colocation facility (10 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Prangl hebt Stromaggregate ins Rechenzentrumbaublatt.at· Jan 8, 2026
- Quantencomputer aus Tiroltop.tirol· Dec 17, 2025
- „Innsbruck ist eines der weltweit führenden Zentren für Quantencomputing“VC Magazin· Dec 2, 2025
- RAITEC: Kärntner Raiffeisen-IT wird integriertRaiffeisenzeitung· Jul 30, 2025
- Großes Rechenzentrum für Osttirol geplanttirol.ORF.at· Dec 6, 2024
- Quantencomputer fürs RechenzentrumUniversität Innsbruck· Feb 6, 2024
See something wrong or missing on this page? Suggest a correction.