Skip to content
DataCentersExposed
Operatingcolocation

Databank LGA3

2000 Corporate Drive · Orangeburg, Rockland County, NY

Source: OpenStreetMap

Databank LGA3 is an operating data center in Rockland County, NY, operated by DataBank Holdings, Ltd.. DataCentersExposed has documented a 197,452 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
DataBank Holdings, Ltd.
Operator
DataBank Holdings, Ltd.
Est. capacity
~35-80 MW
Footprint
197,452 sq ft
Interconnection
~37 MW
Utility
Orange & Rockland Utils INC
Grid
NYIS
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Databank LGA3 is an operating colocation data center in Orangeburg, Rockland County, New York, run by DataBank Holdings, Ltd. Its reported footprint is 197,452 square feet. The site draws power from Orange & Rockland Utilities Inc within the NYIS grid.

Operator chain

The grid behind this site, right now

source: NYISO · gridstatus
Clean right now
51%
Fossil right now
43%
Grid operator
NYISO
  • Natural Gas43.0%
  • Nuclear26.7%
  • Hydro21.6%
  • Other5.9%
  • Wind2.7%

Real-time generation mix for the NYISO grid this site draws from, as of Jun 16, 2026, 4:25 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to DataBank Holdings, Ltd. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source

Water use

Modeled estimate~544.9K gpd
Direct (onsite cooling)
~225.2K gpd
Indirect (its electricity)
~319.7K gpd

No measured record exists, so this is a low-confidence model from 37 MW (interconnection capacity): 1.2 L/kWh cooling (cool climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
71
O3
Moderate
60
PM2.5
Moderate

Air Quality Index from the nearest AirNow reporting area (New York City Region), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$193.6K
People of color
16%
Below poverty
2%
Tract population
7,377

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Pearl River Middle School in Pearl River, is 1.0 mi from this site (523 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.