CPD Gobierno de Navarra
Navarra / Nafarroa, Spain
Source: OpenStreetMap
CPD Gobierno de Navarra is a mapped data center in Navarra / Nafarroa, Spain, operated by Nasertic. DataCentersExposed has documented a 10,816 sq ft footprint at this site. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkCPD Gobierno de Navarra is a mapped data center in Spain operated by Nasertic. Available records report a footprint of 10,816 square feet. No ultimate parent above Nasertic is listed in the available facts for this Nasertic data center.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.