Skip to content
DataCentersExposed
Mapped (unverified)

CPD Gobierno de Navarra

Navarra / Nafarroa, Spain

Source: OpenStreetMap

CPD Gobierno de Navarra is a mapped data center in Navarra / Nafarroa, Spain, operated by Nasertic. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Nasertic
Operator
Nasertic
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Navarra / Nafarroa
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

CPD Gobierno de Navarra is a mapped data center in Spain, run by Nasertic. Available records identify it as a Nasertic data center. No capacity, footprint, or ultimate parent details are disclosed in the facts on hand.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh

A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Spain data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.