Compass Data Center
Statesville, Iredell County, NC
Source: Primary source
Compass Data Center is a under construction data center in Iredell County, NC. DataCentersExposed has documented a 1,340,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Take action
Iredell, North Carolina
Compass Data Center in Statesville, NC is contested. Petition: https://www.change.org/p/prevent-data-center-construction-in-iredell-county-residential-agricultural-area Track what's being decided, when, and how to weigh in.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: link40 backup generators per building Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Neighbors of Microsoft data center site in Conover say noise, work interrupting their livesHickory Daily Record· Jun 16, 2026
- John Eaton Obituary June 10, 2026Nicholson Funeral Home· Jun 10, 2026
- High-end event venue proposed for Lake Norman mansionsWSOC TV· Feb 28, 2026
- Amazon data center is a bad deal for localsVicksburg Daily News· Feb 7, 2026
- Iredell-Statesville school board chairman accused of threatening fellow member after meetingWCNC· Jan 22, 2026
- Data centers bring both promise and concerns in North CarolinaThe Business Journals· Dec 23, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, West Iredell Middle in Statesville, is 1.0 mi from this site (546 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.