Mapped (unverified)colocation
Avenida Montes Sierra 36, Sevilla
Seville, Andalucía, Spain
Source: Primary source
Avenida Montes Sierra 36, Sevilla is a mapped data center in Andalucía, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Andalucía
Overview
source: linkEspacio Rack — colocation facility (8 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Detectado un episodio de contaminación por Ozono en Alcalá de Guadaíra (Sevilla)Europa Press· Jun 18, 2026
- Tecnología, seguridad e inteligencia artificial para blindar el escrutinio del 17-MDiario de Sevilla· May 15, 2026
- La IA se estrena el 17M: se encargará de la verificación del escrutinio de las elecciones andaluzasCadena SER· May 15, 2026
- La Junta de Andalucía cierra su investigación sobre el 'apagón digital': no hubo ciberataque y fue un fallo en el Centro de Datos de Reina MercedesEl Correo de Andalucía· Apr 1, 2026
- Amazon invertirá 12.000 millones de dólares en sus primeros centros de datos en LuisianaDiario de Sevilla· Feb 23, 2026
- Merlin Properties no puede construir centros de datos en Andalucía porque no le garantizan la potencia eléctricaEl Conciso· Feb 4, 2026
See something wrong or missing on this page? Suggest a correction.