Skip to content
DataCentersExposed
Mapped (unverified)

centro de datos trasbase Negratín

Andalucía, Spain

Source: OpenStreetMap

centro de datos trasbase Negratín is a mapped data center in Andalucía, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 12, 2026

Real parent
Operator
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Andalucía
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

data center

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh

A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Spain data centers.

No recent coverage found for this facility.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.