Mapped (unverified)colocation
Asnet Datacenter Sumeru Bogor
Bogor, Jawa Barat, Indonesia
Source: Primary source
Asnet Datacenter Sumeru Bogor is a mapped data center in Jawa Barat, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Jawa Barat
Overview
source: linkPT. Usaha Adisanggoro — colocation facility (12 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- Investasi Data Center di Tanah Air Menggeliatinvestor.id· Jun 4, 2026
- Pergudangan Modern dan Logistik Jadi Sektor Properti Terkuat pada 2026Medcom.id· May 12, 2026
- Tak Cuma Perumahan, AJP-BRIN Bakal Garap Riset Data CenterIndonesia Housing· May 1, 2026
- PLN Tuntaskan Infrastruktur Listrik Data Center Microsoft sebagai Pusat Pertumbuhan Ekonomi DigitalPosbelitung.co· Apr 29, 2026
- PLN Dukung Keandalan Data Center, Pasokan Listrik Andal Perkuat Infrastruktur Digital NasionalTribunjabar.id· Apr 26, 2026
- Digital Edge akan bangun pusat data AI senilai Rp10 triliunANTARA News Megapolitan· Mar 20, 2026
See something wrong or missing on this page? Suggest a correction.